Pressure Testing: Locking the pipes and pumping water at high pressure (using a pressure pump) for 24 hours to ensure there are absolutely zero leaks before plastering over them.
3. Trim Phase / Fixture Installation (Final Fix)
This takes place after tiling, painting, and finishes are completely done.
Sanitary Ware Installation: Fitting the toilets, sinks, bathtubs, and showers.
Accessories: Installing water faucets, mixers, water heaters, and water pumps.
Final Inspection: Testing the water flow and drainage speed to ensure everything functions perfectly.
Electrical Works
Electrical installation runs parallel to the building structure, divided into four main steps.
1. Embedded Conduits Phase (First Fix / Slab)
This happens during the structural framing, right before pouring concrete slabs (ceilings).
Conduit Laying: Flexible or rigid plastic pipes (PVC conduits) are laid down between the steel reinforcement bars of the ceiling.
Junction Boxes: Placing the boxes where ceiling lights, fans, and chandeliers will eventually hang.
2. Wall Rough-In Phase (Second Fix / Walls)
This happens after wall brickwork is finished.
Wall Chasing: Cutting grooves into the brick walls to drop pipes from the ceiling down to the switches and outlets.
Back Boxes (Switch Boxes): Fixing the metal or plastic boxes (العلب الماجيك) into the walls using cement mortar.
Distribution Board (DB) Fixing: Mounting the main breaker panel box into the wall.
3. Wire Pulling Phase
This is done after wall plastering is dry but before final painting.
Cable Drawing: Using a steel fish tape (السوستة) to pull electrical wires through the embedded conduits.
Separation: Grouping wires according to their load (Lighting circuits, Power socket circuits, and AC lines).
Earthing (Grounding): Pulling safety ground wires to protect the house from electrical shocks.
This is the very last step after final wall painting.
Switches & Sockets: Installing the outer frames, switches, power sockets, internet, and TV outlets.
Lighting Fixtures: Hanging chandeliers, spots, LED strips, and outdoor lights.
Panel Termination: Connecting the wires inside the main distribution board to the circuit breakers (MCBs).
Energizing: Turning on the main power supply to test the voltage, polarities, and safety trips.
“Proactively envisioned multimedia based expertise and cross-media growth strategies. Seamlessly visualize quality intellectual capital without superior.”
- John Henry
Features of Project
Prepare Documentation
Brand Consistency
Quality Control System
Prepare Documentation
Brand Consistency
Quality Control System
Working Process
01
Step
Inspection & Consultation
All the Lorem Ipsum generators on the Internet tend to repeat predefined.
02
Step
Customized Solution
Ority have suffered alteration in some randomised words which don't look.
03
Step
Installation & Repair
All the Lorem Ipsum generators on the Internet tend to repeat predefined.
04
Step
Testing & Ongoing Support
Handful model sentence structures
generate which looks reasonable.
Project Information
Completely synergize resource taxing relationships via premier.